10 point DR power checklist defined in Janco DR/BC Template

10 point DR power checklist — After an event that disrupts a network, availability of power to recover and run the network often is critical.  Below is a 10 item check list of what to consider in your disaster recovery – business continuity plan.

  1. Electricity, water, broken wires do not mix.  Before anything else validate that the power source and power distribution systems are dry and functional before power is turned on.
  2. Understand the minimum power requirements to be operational.  Have a clear understanding of a facility’s critical loads.
  3. Have an adequate fuel supply to operate backup power sources. Make smart fuel and technology choices, considering things such as if natural gas pipeline service were to be disrupted in your community. Make sure that you have sufficient fuel storage capacity onsite for an extended outage.
  4. Set reasonable response times for standby generator.  Frequent outages of a few seconds, a few minutes, or more, can have significant cost implications for businesses. While some other generators take up to two minutes to engage, diesel-powered generators are uniquely able to provide full load power within 10 seconds of a grid outage.
  5. Maintain your equipment and test it operations. Standby generators should be exercised periodically to ensure they will operate as designed in the event of an outage.
  6. Understand your environment and geography.  Even the best generators won’t work underwater when subjected to extreme flooding.  Check unit location for protection from flooding and ensure you use the proper gauge extension cord.
  7. Set up generators in an “open environment”. Use generators or other gasoline or charcoal-burning devices such as heaters in an open area or outside near an open window. Carbon monoxide fumes can build up and poison people.
  8. Quarterly review your load.  Know when there are any new demands or critical circuits to protect.  If you’ve added new computers or other power-hungry devices, consider updating switchgear.
  9. Meet all mandated compliance requirements. Make sure you have the proper permits and records on operations.
  10. Optionally contract for a rental power source.  Consider a rental generator power for use in the event of an extended outage.

Order Disaster Plan TemplateOrder Disaster Plan TemplateDisaster Plan Sample

Author: Victor Janulaitis

M. Victor Janulaitis is the CEO of Janco Associates. He has taught at the USC Graduate School of Business, a Graduate School at Harvard University, been a guest lecturer at the UCLA's Anderson School of Business and several other universities in various programs.Prior to Janco, he was a Vice President at Index Systems and found PSR, Inc. and internationally recognized consulting practice.